Professional Work Samples

Office SvN Architects + Planners

Role Architecture + Urban Design Assistant

Location Toronto, ON

Duration 4 months

 
 

In the winter of 2022, I had the opportunity of working at SvN Architects + Planners where I produced drawings for public display, participated in the design of large mixed-use developments and created , quickly and effectively, communicative diagrams for varying clients. This was all accomplished at the scales of architecture, landscape architecture and urban design.

 

309 Cherry St.

Situated on Toronto’s lower port lands, 309 Cherry St. is the tallest building on the envisioned Villier’s Island. It is a mixed-use complex spanning two blocks and re-identifying Toronto’s waterfront and urban context.

In collaboration with Chris Fay, Terence Tourangeau & Osei Wireko

 
 
 
 
 

Beaver Valley Ski Resort

Located in Markdale, ON, near the Georgian Bay, Beaver Valley Ski Resort needed a renovation and expansion. The interior was designed to become more functional and an addition was added to meet the needs of the resort’s growing clientele.

In collaboration with Aziza Asat & Fraser Plaxton

 
 
 
 
 
 

Gilead St.

This project features a unique master plan strategy that responds to the client’s ambitions for a revenue-generating build out. Phase 1 envisions a “pop-up” cultural destination with a 10-15 year life that preserves the character of the existing lane ways and creating opportunities for public spaces, arts programming and retail (Two options are explored below). Phase 2 re-imagines a long term high density mixed-use build-out of the site.

In collaboration with Joseph Kan

 
 
 
 
Previous
Previous

Queen St. N